關鍵詞38:高溫氣冷堆核電站示范工程
2008 年2月,國務院批準了《高溫氣冷堆核電站重大專項總體實施方案》,高溫氣冷堆重大專項正式啟動實施。該項目目標是以清華大學核研院已運行的 10MWt 高溫氣冷實驗堆為基礎,建成具有四代核安全特征的自主知識產權的200MWe級模塊式商業(yè)化示范核電站。2004 年3月,中國華能集團、中國核工業(yè)建設集團、清華大學簽署合作建設高溫氣冷堆核電站示范工程的框架協議,2012 年12月9日,示范工程在山東石島灣開工建設。到2021 年年中,示范工程已經完成工程建設以及裝料前的全部冷態(tài)、熱態(tài)調試試驗。
Keyword 38:High-temperature Gas-cooled Reactor Demonstration Project
The High-temperature Gas-cooled Reactor (HTGR) Demonstration Project was officially launched following the State Council’s approval in February 2008 of the overall plan for its implementation. The goal of the project is to build a 200 MWe-level modular commercial demonstration plant with domestically developed technologies and Gen IV nuclear safety features, based on the 10 MWt experimental HTGR operated by the Institute of Nuclear and New Energy Technology at Tsinghua University. In March 2004, the China Huaneng Group, the China Nuclear Engineering & Construction Corporation, and Tsinghua University signed a framework agreement to cooperate in implementing a project on HTGR demonstration. On December 9, 2012, the demonstration project was launched in Shidao Bay, Shandong Province. By mid-2021, the engineering construction as well as cold and hot functional tests have been completed.
網友評論請注意
遵守中華人民共和國有關法律、法規(guī),尊重網上道德,承擔一切因您的行為而直接或間接引起的法律責任。
中國核電信息網擁有管理留言的一切權利。
您在中國核電信息網留言板發(fā)表的言論,中國核電信息網有權在網站內轉載或引用。
中國核電信息網留言板管理人員有權保留或刪除其管轄留言中的任意內容。
如您對管理有意見請用 意見反饋 向網站管理員反映。